Case studies

Proven deployments across the Philippines.

Explore how transport cooperatives and LGUs use GerWeiss electric tricycles and battery swapping to modernize fleets, increase driver income, and reduce emissions.

Operating environments
  • Boracay island electrification
  • Coron tourist transport
  • Metro Manila urban routes
150+ Active fleet in Boracay
200-500% Driver income increase
< 2 min Battery swap turnaround
Operating environments View key facts
  • Boracay island electrification
  • Coron tourist transport
  • Metro Manila urban routes
150+ Active fleet in Boracay
200-500% Driver income increase
< 2 min Battery swap turnaround
Case Studies

Deployment proof from the field.

Real deployments, real outcomes. See how GerWeiss helps operators and partners electrify public transport.

ADB e-trike pilot

ADB e-trike pilot

GerWeiss vehicles and operations became the reference model for the Asian Development Bank e-trike financing initiative in the Philippines.

Read the case study
A green commercial-grade GerWeiss GE4 electric tricycle effortlessly navigating the steep, sloped terrain and narrow roads of Boracay island. Powered by a 150+ km range 5-Star lithium-ion battery, this zero-emission public utility vehicle carries up to 9 passengers while completely eliminating the noise and air pollution associated with traditional gasoline tricycles.

Boracay fleet electrification

Since 2013, GerWeiss has partnered with the LGU of Malay to replace fossil-fueled tricycles on Boracay Island with a fully electric public transport ecosystem - commercial e-trikes, fast charging, solar charging, under-2-minute battery swapping, and local fleet maintenance. Today GerWeiss manages roughly 30 percent of Boracay's tricycle population.

Read the case study
A group of seven smiling local public transport operators standing proudly in front of a fleet of white and green GerWeiss Motors GE4 electric tricycles. These drivers participate in the Boracay 100% EV transition program, utilizing a zero-cash-out battery swapping ecosystem that empowers the local community and increases daily take-home pay by 200 to 500 percent.

Coron, Palawan deployment

Since 2019, GerWeiss has deployed a full electric public transport ecosystem in Coron, Palawan: more than 50 commercial e-trikes in active service, supporting operating infrastructure, and a Philippine field service team. Coron is the second island ecosystem in the GerWeiss national network after Boracay.

Read the case study
E-Trike in front of Mall of Asia

Pasay City pilot

GerWeiss is actively supporting a pilot test for in Pasay City for the revitalization of cooperative-owned electric tricycles.

Read the case study
What we measure

Why deployment proof matters.

We document the location, fleet type, operating challenge, deployment model, and measured outcome so operators and partners can evaluate electrification with real-world data.

  • Operating pain points before electrification
  • Vehicle, swapping, and charging models used
  • Outcomes for uptime, drivers, and emissions
Next Step

Ready to discuss your deployment?

Request a proposal or contact us to explore how GerWeiss can support your electrification project.

Request a proposal WhatsApp